To Do
An ongoing list of some of the projects around the house:
Living Room:
Touch up paintPaint built-in shelvesFix built-in trimHem curtains- Purchase rug
- Refinish stereo cabinet
- Frame and hang prints
- Find new front screen & entry door
Remove curtain tie-backsPatch & paint wall from tie-backs- Hang Emil Lukas work
Reinforce built-in shelves- Refinish or replace coffee table
Refinish theatre seats- Install flooring
Touch up trimInstall theatre seats
Hallway:
- Touch up paint (ceiling-walls-trim)
Change out lightHang printStain & wax drawersPaint wallpaper trim- Clean window casement
- Caulk window
- Caulk wallpaper edge
- Install smoke detectors
- Hang curtain/frost window
- Install floor at landing
- Touch up trim
Stairs:
- Remove nails & staples
- Reinforce loose steps
- Clean
- Rough sand
- Caulk gaps
- Prime everything
- Paint risers white
- Paint treads grey
- Refinish railing
Bathroom:
- Wash walls
- Touch up paint
- Rip out caulk
- Recaulk tub
- Recaulk window
- Caulk shower edge
- Paint medicine cabinet
- Clean up paint spatters
- Install new fan/light
- Frost shower window
- Resurface sink
- Clean & Paint sink pipes
- Paint door trim
- Clean door hardware
- Paint door
- Paint door hardware
- Find under sink storage
- Mega cleaning
- Seal shower grout
- Seal floor grout
- Rehang door
Dining Room:
- Paint trim (two coats)
- Paint mantle (two coats)
- Touch up white walls
- Touch up ceiling
- Enlarge baseboard vent
- Remove fireplace insert
Paint wall blue (two coats)- Refinish buffet
Paint bookshelf- Wash – Iron – Hem curtains
- Install curtains
- Refinish table
- Repair chairs
- Refinish three doors (clean-sand-patch-prime-paint)
- Refinish door hardware
- Clean window casements
- Caulk windows
- Install floors
- Touch up trim
Master Bedroom:
- Repair walls
- Repaint grey
- Final coat on trim
- Paint inside fireplace
- Touch up cleaning
- Replace light fixture
- Refinish three doors (clean-sand-patch-prime-paint)
- Refinish hardware
- Install new vents
- Hang blinds
- Hem-Iron-Dye-Hang curtains
Find new dresser/wardrobe- Refinish bed
- Refinish nightstand
Stain & Paint mini dressersReupholster chair- Paint & hang mirror
- Frame & hang prints
- Install carpet/hardwood
There’s all that plus the guest room, kitchen, attic, basement, exterior & garden. Then you throw in the general projects like rewire the house and insulate and it should be done in no time right?